Scope of our inspection commenced when reactor was stored on stools at Larsen & Toubro facilities, India. SPMT picked the reactor to be loaded and secured on barge at L&T jetty, thence shipped to Adani Hazira port to be loaded and secured ocean vessel “LONE”.

Appointment SADARA Project (Saudi Arabia)
POL Jetty and ADANI port (INDIA)
Vessel name / Owner LONE – SAL
Date of attendance December , 2.013
Commodity 1 x Reactor and feed water boiler preheater
Dimensions : 21,30 x 13,00 x 10,25 m
Weight : 1.294 tons (each)